Pamet
Anadolu OSB / Ankara

- BUILDING AREA
- 2,790 m²
- LOCATION
- Anadolu OSB
- BUILDING TYPE
- Factory & Administrative Building
- SCOPE OF WORK
- Turnkey completion
From requirements
to construction.
A 2,790 m² factory built for Pamet – Hasan Parlak at Block 100543, Plot 10, Anadolu Organised Industrial Zone, Ankara. Delivered turnkey using precast concrete, the project coordinated foundations and fill, factory construction, services and office finishes. Floor slabs, external concrete paving, infrastructure connections and landscaping were also included.
- Pad foundations and precast factory construction
- Floor concrete, stone and compacted aggregate fill and external concrete paving
- Connecting drainage, rainwater and wastewater lines to the discharge network
- Mechanical, heating, fire-protection and compressed-air systems
- Electrical installations, security cabling and data networks
- Office finishes and suspended ceilings
- Sectional doors and fire doors
- Landscaping and external works
Every stage of the building.
Before the first step.
Explore the guides ↗What should you prepare before building a factory?
Plot, production, floor area, structural system and programme: a practical guide to preparing for your first factory investment meeting.
Read the guide ↗02 / GUIDEWhat does turnkey factory construction include?
Structure, building services, finishes and handover in turnkey factory construction; understanding the difference between structural system and scope of work.
Read the guide ↗03 / GUIDEFactory construction: shell, completion and turnkey scopes compared
Compare shell construction, completion of unfinished buildings and turnkey delivery for your new or partially built factory.
Read the guide ↗