Akyurt Market · 30,000 m² warehouse ↗
The stated 2.5 months refers to completion of column-pocket foundations, not the ready-for-use handover of the entire warehouse.
Buildings designed for storage, dispatch and site operations.
Warehouse and logistics requirements are assessed together with loading, unloading, storage and vehicle movements. Warehouse is the building type; the structural system and scope of work are determined separately to suit the project.
Stored products, racking layout, clear spans and heights and loading areas are assessed at the start. Movement between the site and building is an important part of planning.
The work to be undertaken is clarified from foundations and structural frame to external works. With turnkey delivery, building services and finishes are completed within the agreed scope.
Area and column-pocket foundation information for the Akyurt Market warehouse is explained separately on its project page. The pocket completion period is not the handover period for the entire warehouse.

Intended use and delivery boundaries are as important as warehouse area. General storage, cold storage and spaces used alongside production have different requirements.
The stated 2.5 months refers to completion of column-pocket foundations, not the ready-for-use handover of the entire warehouse.
The total enclosed area of 1,600 m² includes production, cold storage and offices. It is not all cold-storage space.
Share the location, approximate area, current design status and target programme. You can also attach drawings to your enquiry.
I’d like to share my project ↗Let’s assess the intended use, plot conditions and available documents.
Let’s clarify the work to be undertaken and each party’s responsibilities.
Let’s discuss a quotation and programme based on the agreed requirements.
Initial information includes stored products, approximate capacity and area, any racking plan, vehicle and loading requirements, clear height, site location and existing designs. Cold-storage or specialist operating conditions should be stated separately.
Such equipment is not automatically included. Procurement, installation, infrastructure connections and commissioning responsibilities are defined separately. Interfaces between building work and equipment must be clarified before the quotation.
Design teams assess product and racking layouts, loads stated by the operator, handling vehicles and operating conditions together. Floor specifications are determined from these requirements; there is no standard solution based solely on total warehouse area.
Building type, structural system and delivery scope are three separate, complementary decisions.
Plot, production, floor area, structural system and programme: a practical guide to preparing for your first factory investment meeting.
Read the guide ↗02 / GUIDEStructure, building services, finishes and handover in turnkey factory construction; understanding the difference between structural system and scope of work.
Read the guide ↗03 / GUIDECompare shell construction, completion of unfinished buildings and turnkey delivery for your new or partially built factory.
Read the guide ↗04 / GUIDEA checklist for comparing factory quotations by area, quantities, materials, included and excluded work, programme and handover criteria.
Read the guide ↗05 / GUIDEReview the information to prepare on existing works, documents, building services, finishes and phasing before completing an unfinished factory.
Read the guide ↗Based in Ankara, Erkonsan considers enquiries for shell construction, completion of unfinished buildings and turnkey factory, industrial and warehouse projects. With priority given to Ankara and surrounding provinces, you can contact us about projects in the provinces below.
We provide services across Türkiye depending on the project scope. The work to be undertaken is defined through a joint assessment of location, scope, target programme and site conditions.
We delivered the 3,600 m² Kayın Su facility in Bayındır Village, Eskipazar, Karabük on a turnkey basis using a precast reinforced concrete system. Explore the foundations, industrial concrete floor, infrastructure, roofing and external works on the project page.
Kayın Su project · Karabük ↗The provinces above are service areas where we consider project enquiries. The locations and scopes of completed investments are shown on the relevant reference pages.
We would like to use Google Analytics to understand visits and the use of contact links. If you agree, usage data will be sent to Google. You can change your preference at any time. Details